No |
Project Name |
Construction Scale and Content |
Total In’t(USD 10000) |
Project Progress |
Projector Initiator |
Liaison |
Telephone |
No.1 |
319
National Highway Ningxiang County Section (Chuwei Road) Weatern section reconstruction project |
319 National Highway Ningxiang County Section (Chuwei Road) Weatern section, it is intended to broaden the width to 30 meters,dual four-lane carriageway,seperated by green belt in middle, the symbol engineering is built in both ends. |
3000 |
The eastern and middle section has been reconstructed, and western section has
been approved for feasibility study. |
Ningxiang
County Investment &
Cooperation Bureau |
Peng Zhiyong |
0731-8980178 13874890159 |
No.2 |
Changsha
Binjiang Avenue T-shaped section construction |
Changsha Binjiang Avenue T-shaped section is the main road along eastern of the Xiang
River, it is Changsha Xingang Town Xianinggang old market Town in the south,and is T-shaped Town Tongguanyao in the north, via six villages, as T-shaped Town Fanshenyuan Village, Jinyun Village, Xingcheng Community, Shutang Village,
Shishe Lake and Caitao Village, the total length is 20 kilometers. The design of the road is dual four-lane with 36 meters in width. |
1600 |
The plan & design has
been completed. |
Wangcheng
County Investment &
Cooperation Bureau |
Liu
Changfu |
13007490499 |
No.3 |
Wangcheng
County T-shaped Industry Park Avenue construction |
T-shaped
Industry Park Avenue is two trunk roads of T-shaped Industry Park Avenue in
length and breadth, ie., western connection of park road, southern connection
of park road with the total length is about 5.8 kilometers. The road is
designed as dual four-lane with 36 meters in width. |
700 |
The plan & design has
been completed. |
Wangcheng
County Investment &
Cooperation Bureau |
Liu
Changfu |
13007490499 |
No.4 |
Wangcheng County Yinshan Road |
Yinshan
road construction is one of the trunk roads in Wangcheng County Xingcheng
district road network. The road starts from the junction of Yinxing Eastern
Road & Jinxing Avenue, ends at Xiang River Shanchaji Bridge in Yuelu
District. The whole road runs trough Xingcheng Town Yinxing Village with
total length about 5.6 kilometers. the road coverage is 434mu. It is designed
according to urban main trunk road with dual six-lane and 46 meters in width. |
4137 |
The
Yinshan Road has been finished listed as project and construction design. The
levy and remove work has being undergone, the road red line has been prlonged
to Provincial Land and Resources Office.
|
Wangcheng
County Investment &
Cooperation Bureau |
Liu
Changfu |
13007490499 |
No.5 |
Wangcheng County life
garbage transfer station |
The
initial selected site is Huangjin Village Fengshu Po with land coverage
of 45 mu and total construction
area 16,070 square meters. the
daily garbage treatment is 500 ton. The service area is covering the county
western Xiangjiang River bank area, mainly for county and Gaoxing group, as
well as villages and towns as Leifeng,Wushan, Dazongyuan etc. It is large size(Ⅱ) life garbage transfer station to transfer garbage to urban
solid castoff fill site for treatment. The main constructions are
comprehensive biulding, compressing workshop, machinery repair workshop,
power distribution room, door guard, measure pound room,canteen,terrace, vehicle lane, as well as the
subsidiary facility construction, such as water, electricity, road, car park,
greening etc. |
550 |
The
project has been finished previous preparation work, such as feasibility
study, enviroment comprehensive appraisal, initial site selection plan land
declaration. The project has been approved by County Government Standing
Committee Conference, the construction period is one year. |
Wangcheng
County Investment &
Cooperation Bureau |
Lin
Bo |
13808432589 |
No.6 |
Changsha
Chemical Industry Base infrustracture construction |
In
order to improve Changsha-Zhuzhou-Xiangtan environment condition and quicken
the development of small cities& towns and inductrialization process, as
well as graspp the opportunity of Huadian Changsha Electric Power Plant in Tongguan Town,
It is intended to construct Changsha Chemical Industry Base in Northeast
corner of Tongguan Town and northern of Changsha Electric Power Plant. This
project is divided into three stages, the first stage covers 4,500 mu,and is mainly for infrastructure
adn subsidairy construction, such as land leveling& road, water supply
and drainage, power supply, communication, heat power, network, greening,
flood prevention, as well as outter traffice trunk road, sewage treatment
factory and industry usage water factory. |
15900 |
It
has been completed the whole design, land untilization whole plan, previous
landoform mapping plot, environment appraisal outline and feasibility study,
the prolonged Power factory avenue of the main trunk road of the base has
been finished road bed. |
Wangcheng
County Investment &
Cooperation Bureau |
Liu
Changfu |
13007490499 |
No.7 |
Liuyang River Middle Road
project |
Liuyang
River Middle Road locates at
Huaichuan Street affair office and Guankou Street Affair Office, from Liuda
Road in the West and end at Jingcheng Avenue in the East, with Liuyang River
in the South, and reaches Cuiyuan Road and Shuijia Road in North. The project is the key junction of
Liuyang new and old city zone, is the golden yard of tne new city zone. The land is in L-size, it is 320m-530
m from south to the north, 3,300 meters
from east to the west, the total land coverage is 1,579 mu. According to Liuyang whole
layout and controlling detailed plan requirements of this city, the land is
comprehensive lan , which can be used as commercial, residence, finance,
recreation etc. |
46478 |
It has been listed
into the urban whole layout. |
Liuyang Urban Construction
Group Co., Ltd |
Ling Jianzhou |
0731-3655108 |
No.8 |
Changsha
water diversing & water quality environment engineering Liuyang City
water supply project |
It
connects main pipe water diversion gap of Changsha diversion engineering,
divert the water to Liuyang urban zone. The main pipe is 5,000 meters with
subsidairy pipe lines 12,000 meters and other subsidiary facilities. |
736 |
Continued construction |
Liuyang Tap Water Company |
Jiang Heping |
0731-3611492 |
No.9 |
One river, two
banks, three districts development |
It
is to construct Ningxiang RBD Core district, Ningxiang ecological sustainable
development community, Ningixiang golden commercial zone, Ningxiang core
scenic spot area. The planned area is 56773 mu,man power wetland is 3,000mu,newly added planned land is 21,370 mu. |
10000 |
It
has been listed as project, the dismantling work has been completed, three
districts removal started. |
Ningxiang
County Urban Construction
Investment Co., Ltd |
Lu Haoming |
0731-8980036?? 13975868227 |
No.10 |
The
second stage of Ningxiang County Yuening Road construction |
the
first stage of Yuening Road prolonged in the south, starts from Renmin south
road, and connect the Wei River bank and natural scenic view along the river
project. |
3000 |
The
first stage work has been completed, and the second stage completed the
design. |
Ningxiang
County Investment &
Cooperation Bureau |
Chen Yonggao |
0731-8980178 13308437999 |
No.11 |
Ningxiang
County Renmin North Road link construction |
It
starts from Labour Cultural Palace of Renmin North Road , linking with Xin
Renmin Road North Road and the yihuan Road juncture. The total length is
1.196 kilometers,it is the
main traffice road of the county road network as three road from east to west
& four roads from south to north. |
556 |
The project has been finished
plan. |
Ningxiang
County Investment &
Cooperation Bureau |
Chen Yonggao |
0731-8980178 13308437999 |
No.12 |
Ningxiang County
Urban Sewage Treatment factory |
The
project has been divided into three stages, It is 5000 cubic meters per day
in every stage. |
2200 |
The project has been
listed for project. |
Ningxiang
County Investment &
Cooperation Bureau |
Ou
Zhaobo |
0731-8980036